ABB Three Phase 3FTC

4.8 kVA — 50 kVA

ABB Three Phase Lighting Inverter

Uninterruptible Emergency Lighting Inverter System

4.8 kVA — 50 kVA

 UL listed to UL 924. Meets NFPA101, NFPA70, NFPA 110, OSHA, UBC, SBCCI. N.Y City approved.

Three Phase Series

  • Features

    • 98% efficient at full load
    • PWM/IGBT technology
    • Self-testing/self-diagnostic
    • User programmable with password protection
    • Standard input circuit breaker
    • Standard normally off and on output
    • RS232 communication port
    • Micro-processor controlled
    • Automatic event and alarm log
    • 90 min. standard run time
    • Generator compatibility
    • Available in Y or ∆ input configuration
    • Custom voltages available
    • Automatic event, test and alarm log
    • LCD display
    • Reduced footprint
    • Maintenance free standard batteries
    • Forced air cooling during emergency mode only
    • VRLA and Lithium Ion Solutions Available

ABB Three Phase 3FTC features and benefits


Inverter

Using IGBT/PWM technology the inverter converts the DC voltage supplied by the batteries to AC voltage of a precise stabilized amplitude and frequency, suitable for most sophisticated electrical equipment. True sinusoidal output waveform with very low distortion (less than 3% for linear loads). Overload capability of up to 150% for 12 line cycles.

Charger

System is provided standard with 10 year, maintenance free, sealed valve regulated, front terminals Lead Calcium batteries. 20 year sealed Lead Calcium battery also available. 90 min. standard discharge time at full load under normal operating temperature. Low Voltage Disconnect protection included. No special ventilation required.

Battery

High/low battery charger voltage, high/low AC input voltage, near low battery, low battery, load reduction fault, output overload, high ambient temperature, inverter fault, output fault, optional output circuit breaker trip. Ask about lithium ion lighting inverter solutions for ABB Central Lighting Inverters.

Self-Diagnostic

Fully automatic, temperature compensated, microprocessor controlled charger recharges fully discharged batteries in maximum 24 hours at nominal AC input voltage. AC input current limiting and over-voltage protection included.

Alarms

Automatic self tests consist of a 5-minute monthly and 90-minute annual function. The front-mounted control panel includes 5 LED indicators, a 2-line 20-character LCD display, a keypad to control and monitor the internal operation of the system. This allows the operator to easily “watch” system functions as they occur and check on virtually any aspect of the system’s operation. Standard RS232 diagnostic interface.



Emerg-Power Systems 3FTC Series

Download and learn more:

Emerg-Power Systems 3FTC Series

Related Products

Can't find what you are looking for? We're here to help. Chat with a representative instantly or call 888.501.1887.

ABB Three Phase 3FTC

4.8 kVA — 50 kVA

View Product

FirstLine PLT 924

9 — 54 kW

View Product

FirstLine PL 924

10 — 40 kVA

View Product

FirstLine P 924

58.5 kW — 225 kW

View Product

DSPM Eternalight 3 Outdoor

3 kW — 125 kW

View Product

DSPM Eternalight 3 Harsh

3 kW — 125 kW

View Product

EATON 93PM UPS

50 — 200 kVA

View Product

EATON 9355 UPS

10 — 30 kVA

View Product

DSPM Eternalight 3

3 kW — 125 kW

View Prodct

Lighting Inverter Enclosures

120 V — 480 V

View Product

Power Wave 3

8 kW — 50 kW

View Product

Power Wave 4

8 kW — 400 kW

View Product

Shaker Table Power Wave 3

8 kW — 50 kW

View Product

Shaker Table Power Wave 4

8 kW — 400 kW

View Product

ABB Three Phase 3FTC

4.8 kVA — 50 kVA

View Product

FirstLine PLT 924

9 — 54 kW

View Product
View All

Single Source Lighting Inverter Provider

Expert assistance from Technical Consultants assist in the selection process of your next Inverter System. Our team is available for Technical Review of specifications, Sizing assistance, Voltage selection, and Runtime Calculations.

Latest News

Stay up-to-date with Lighting Inverter's news and resources about the industry!

Our Resources
a red exit sign is hanging from the ceiling in a dark room .
27 Feb, 2024
Illuminate the path to safety with our guide on emergency lighting code compliance. Ensure your spaces meet safety standards effectively.
By Tyler Marks 31 Jan, 2024
Electrical supplies for homes and businesses commonly use single-phase alternating current (AC). This alternating current works with most appliances, simple office equipment, lighting, and other devices. Yet for large companies with complex equipment and in many other countries, equipment relies on three-phase alternating current. There are some key differences, advantages, and disadvantages when comparing single-phase vs three-phase power. Understanding these differences will allow you to select the right one for your company.
13 Oct, 2023
A lighting inverter system is made up of it’s power conditioning component, inverter components, charging, and the backup runtime component which are batteries. The UL 924 compliance code requires that 90 minutes of battery minimum are provided to all exit sign routes. This 90 minute runtime can only pass it’s minimum test by having well charged, healthy batteries.

Request a Quote


Experienced Product Representatives are on hand to send you information and quotations for equipment. If you need help with sizing, installation planning, or general questions about product please fill in the appropriate form and someone will contact you shortly. You may also call 844-501-1887 to get a direct product representative.

ABB Three Phase 3FTC Page Form

Share by: